Constantin ENACHE, Oana IONUŞ
Abstract: In order to carry out the foundation of WEST GATE MALL establishment, because the phreatic water level proved to be 1-2 m higher than the geotechnical study preestablished one, it was necessary its temporary lowering. For this problem to be solved we have suggested a double series of drillings with submersible pumps and between these foundations could be safely executed. Thus, according to our calculations presented in the article, the distance between the series of drillings has been established at 20 m, the dislevelment in the drillings reaching 4 m.